This technical report documents the electrical assessment and upgrading of the Mabiga Substation from 10 MVA to 20 MVA, 69 kV/ 13.2 kV, in Mabalacat City, Philippines. The study focuses on ensuring safety, reliability, and cost-effectiveness while addressing the increasing power demand of the area. Significant electrical calculations, including load forecasting, power system modeling, voltage drop, short circuit analysis, and protection coordination, are presented. Results indicate that a 20 MVA transformer is the optimal expansion plan considering a 30-year lifespan. The proposed project addresses overloading issues and improves power quality for the member-consumers of Pampanga II Electric Cooperative (PELCO II).

Downloads

Download data is not yet available.

Downloads

Published

2026-05-18

How to Cite

Edmon F. Simpao, Reynaldo H. Gomez Jr., & Michael John M. Villar. (2026). Electrical Assessment of 10 MVA, 69 kV/ 13.2 kV Mabiga Substation Upgrading to 20 MVA, 69 kV/ 13.2 kV at Mabiga, Mabalacat City, Philippines. International Journal of Progressive Research in Science and Engineering, 7(05), 36–37. https://doi.org/10.65138/ijprse.2026.v7i05.1286

Issue

Section

Articles

Most read articles by the same author(s)